Jobsite Safety
Confined Space
Electrical Work
Hot Work
Excavation
Project Specific
Fall Elimination
Can the hazard be removed?
Fall Prevention
Guardrails and toe boards installed
Fall Arrest
A — Anchorage system utilized · B — Body harness worn · C — Connecting device
Fall Restraint
System utilized to prevent falls
Dropped Objects
Perform proper housekeeping. Protection of open edges, CAZ, toe boards, netting. Tether all tools and equipment.
Impalement hazards removed / protected
Is the correct ladder used for the job and inspected?
Pre-Use Inspection
Travel Path Identified
Load Secured for Transit
Fork Extensions Required
Hook Available for Hoisting
Certified Crane Operator
Qualified Riggers
Pick Plan Required
Critical Pick
Exceeds 75% of the rated capacity
Crane Pre-Use Inspection
Rigging Pre-Use Inspection
Radio / Hand Signal Communication
Clear Visual with Operator
Flight Path Cleared
Ownership signs and contact info posted
Soft barricade (tape) is appropriate for the hazard?
Barricade tape removed at end of shift?
Hard barricades installed for hazards existing more than one shift
Hard barricades (guard rails, cable, jersey barrier) maintained
Job hazard analysis reviewed for high risk work
Housekeeping (clean as you go)
Lighting of access / egress in place
Chemicals stored properly and SDS available
Cords and cables inspected / GFCI utilized
Tools inspected and in safe working condition
Employee assigned a "Buddy"
Work coordinated with trades and subcontractors
Water containers cleaned daily
Cups and trash receptacles in place
Hand Protection
Task Specific PPE
All employees must review the PTP after returning from lunch and at the end of the shift