Jobsite Safety

Daily Pre-Task Plan

Project Information

Select scope

Fatality Prevention Focus Areas

Permit Required Activities

Confined Space

Electrical Work

Hot Work

Excavation

Project Specific

Project Specific

Work at Height Activities

Fall Elimination

Can the hazard be removed?

Fall Prevention

Guardrails and toe boards installed

Fall Arrest

A — Anchorage system utilized · B — Body harness worn · C — Connecting device

Fall Restraint

System utilized to prevent falls

Dropped Objects

Perform proper housekeeping. Protection of open edges, CAZ, toe boards, netting. Tether all tools and equipment.

Impalement hazards removed / protected

Is the correct ladder used for the job and inspected?

Mobile Equipment

RoleNameName
Certified Operators
Signal Person / Spotter
Flagger

Pre-Use Inspection

Travel Path Identified

Load Secured for Transit

Fork Extensions Required

Hook Available for Hoisting

Emergency Procedures

Cranes and Rigging Operations

Certified Crane Operator

Qualified Riggers

Pick Plan Required

Critical Pick

Exceeds 75% of the rated capacity

Crane Pre-Use Inspection

Rigging Pre-Use Inspection

Radio / Hand Signal Communication

Clear Visual with Operator

Flight Path Cleared

Barricades

Ownership signs and contact info posted

Soft barricade (tape) is appropriate for the hazard?

Barricade tape removed at end of shift?

Hard barricades installed for hazards existing more than one shift

Hard barricades (guard rails, cable, jersey barrier) maintained

General

Job hazard analysis reviewed for high risk work

Housekeeping (clean as you go)

Lighting of access / egress in place

Chemicals stored properly and SDS available

Cords and cables inspected / GFCI utilized

Tools inspected and in safe working condition

Employee assigned a "Buddy"

Work coordinated with trades and subcontractors

Water containers cleaned daily

Cups and trash receptacles in place

Hand Protection

Select hand protection

Task Specific PPE

Select PPE

Tasks for the Day

Hazards / What Can Get You Hurt?

Mitigation and Elimination Measures

All employees must review the PTP after returning from lunch and at the end of the shift

Crew Signatures

Up to 10 crew signatures. All signatures are optional.